Development applications — Mid-Coast Council
7,839 applications since 2019, proposing 11,089 new dwellings.
Largest by cost of works
| Address | What | Cost of works | Status |
|---|---|---|---|
| 106 Forest Lane Old Bar 2430 | Multi-dwelling housing; Change of use of land or a building or the classification of a building under the Building Code of Australia | $147,684,286 | Withdrawn |
| 106 Forest Lane Old Bar 2430 | Multi-dwelling housing; Change of use of land or a building or the classification of a building under the Building Code of Australia | $147,513,651 | Under Assessment |
| 494 Wingham Road Taree 2430 | Seniors housing; Independent living units; Erection of a new structure | $93,571,700 | Determined |
| Port Stephens Street Tea Gardens 2324 | Stratum / community title subdivision | $92,300,000 | Determined |
| 4 Lake Street Forster 2428 | Residential flat building; Seniors housing; Independent living units; Erection of a new structure; Residential Accommodation | $80,000,000 | Determined |
All applications, most recently lodged first
| Address | What | Lodged | Status | Cost | Dwellings |
|---|---|---|---|---|---|
| Surfside Avenue Forster 2428 MOD2024/0104 |
Subdivision | 3 May 2024 | Determined 29 May 2024 |
— | — |
| 34 Lazzarini Drive Harrington 2427 DA2024/0306 |
Erection of a new structure; Residential Accommodation | 3 May 2024 | Determined 23 May 2024 |
$9,465 | — |
| 57 Boambee Street Harrington 2427 DA2024/0327 |
Dwelling house; Alterations or additions to an existing building or structure | 3 May 2024 | Determined 15 May 2024 |
$44,000 | 1 |
| 12 Palmer Street Forster 2428 DA2024/0308 |
Dwelling house; Alterations or additions to an existing building or structure | 3 May 2024 | Determined 13 May 2024 |
$448,000 | — |
| 518 Coomba Road Whoota 2428 MOD2024/0098 |
Dwelling house; Alterations or additions to an existing building or structure | 3 May 2024 | Determined 7 May 2024 |
$95,000 | 1 |
| 2 Josephine Boulevard Harrington 2427 DA2024/0183 |
Alterations or additions to an existing building or structure; Carport | 2 May 2024 | Determined 28 May 2024 |
$46,674 | — |
| 388 Highlands Drive Failford 2430 DA2024/0318 |
Shed; Erection of a new structure | 2 May 2024 | Determined 17 May 2024 |
$40,500 | — |
| 80 Taree Street Tuncurry 2428 DA2024/0289 |
Erection of a new structure; Swimming pool | 2 May 2024 | Determined 13 May 2024 |
$85,360 | — |
| 8 Stitts Close Taree 2430 DA2024/0297 |
Dwelling house; Erection of a new structure | 1 May 2024 | Determined 22 Oct 2024 |
$800,000 | 1 |
| 8 Primrose Street Wingham 2429 DA2023/1142 |
Demolition; Dwelling house; Alterations or additions to an existing building or structure; Erection of a new structure; Balcony, deck, patio, terrace or verandah; Balcony, deck, patio, terrace or verandah (screened enclosures); Barbecues and other outdoor cooking structures; Carport; Minor building alterations (internal); Swimming pool | 1 May 2024 | Determined 20 Jun 2024 |
$172,005 | 1 |
| 29 Amaroo Drive Smiths Lake 2428 DA2024/0310 |
Dwelling house; Alterations or additions to an existing building or structure; Residential Accommodation | 1 May 2024 | Determined 17 Jun 2024 |
$58,100 | 1 |
| 21 Oakwood Close Harrington 2427 DA2024/0240 |
Dwelling house; Erection of a new structure | 1 May 2024 | Determined 29 May 2024 |
$553,014 | 1 |
| 28 Saggers Creek Road Stroud 2425 DA2024/0261 |
Shed; Erection of a new structure | 1 May 2024 | Determined 28 May 2024 |
$59,716 | — |
| 28 King Valley Drive Taree 2430 DA2024/0259 |
Shed; Erection of a new structure | 1 May 2024 | Determined 9 May 2024 |
$16,200 | — |
| 16 Church Street Moorland 2443 DA2024/0232 |
Erection of a new structure; Carport | 1 May 2024 | Determined 7 May 2024 |
$9,800 | — |
| 81 Two Mile Creek Road Coopernook 2426 MOD2024/0092 |
Truck depot; Hours of operation and trading | 30 Apr 2024 | Withdrawn 12 Apr 2017 |
— | — |
| 203 Wherrol Flat Road Dollys Flat 2429 MOD2024/0084 |
Subdivision; Commercial livestock grazing; Agriculture | 30 Apr 2024 | Determined 21 Aug 2024 |
$500 | — |
| 19 Curlew Close Forster 2428 MOD2024/0095 |
Alterations or additions to an existing building or structure; Driveways and hard stand spaces; Earthworks, retaining walls and structural support; Minor building alterations (external) | 30 Apr 2024 | Determined 18 Jun 2024 |
$221,000 | — |
| 1c Beeton Parade Taree 2430 DA2024/0223 |
Alterations or additions to an existing building or structure; Vehicle repair station | 30 Apr 2024 | Determined 24 Jun 2024 |
$99,577 | — |
| 62 Hume Street Gloucester 2422 DA2024/0272 |
Dwelling house; Alterations or additions to an existing building or structure | 30 Apr 2024 | Determined 21 Jun 2024 |
$19,320 | — |
| 2 Joseph Andrews Crescent Taree 2430 DA2024/0294 |
Alterations or additions to an existing building or structure; Swimming pool | 30 Apr 2024 | Determined 30 May 2024 |
$39,500 | — |
| 200 Watsons Road Wang Wauk 2423 DA2024/0241 |
Dwelling house; Erection of a new structure; Temporary building, structure or use; Earthworks, retaining walls and structural support | 29 Apr 2024 | Determined 13 Feb 2025 |
$485,100 | 1 |
| 11 Cowan Road Taree 2430 DA2024/0265 |
Dwelling house; Alterations or additions to an existing building or structure; Residential Accommodation | 29 Apr 2024 | Determined 2 Oct 2024 |
$211,700 | 1 |
| 29 Flett Street Taree 2430 DA2024/0264 |
Subdivision | 29 Apr 2024 | Determined 9 Sep 2024 |
— | — |
| 195 Clarke Street Pindimar 2324 DA2024/0203 |
Dwelling house; Erection of a new structure | 29 Apr 2024 | Determined 12 Jun 2024 |
$88,000 | 1 |
| 16 Barrington Crescent Tallwoods Village 2430 MOD2024/0090 |
Erection of a new structure; Manufactured home | 29 Apr 2024 | Determined 27 May 2024 |
$400,000 | 1 |
| 8 Pioneer Drive Forster 2428 DA2024/0246 |
Dwelling house; Alterations or additions to an existing building or structure | 29 Apr 2024 | Determined 22 May 2024 |
$199,800 | — |
| 1609 Wootton Way Wootton 2423 DA2024/0280 |
Shed; Erection of a new structure | 26 Apr 2024 | Determined 9 Oct 2024 |
$39,009 | — |
| 17 321 Boomerang Drive Blueys Beach 2428 MOD2024/0083 |
Erection of a new structure; Caravan park | 26 Apr 2024 | Determined 19 Aug 2024 |
$23,430,000 | — |
| 128 Boomerang Drive Boomerang Beach 2428 DA2024/0295 |
Demolition; Dwelling house | 26 Apr 2024 | Determined 8 Jul 2024 |
$2,864,311 | 1 |
| 1118 Briton Court Road Stroud 2425 DA2024/0278 |
Shed; Erection of a new structure | 26 Apr 2024 | Determined 3 Jul 2024 |
$25,200 | — |
| 37 Maslin Close Red Head 2430 MOD2024/0088 |
Dwelling house; Erection of a new structure | 26 Apr 2024 | Determined 23 May 2024 |
$505,527 | 1 |
| 10 Belton Way Forster 2428 DA2024/0226 |
Dwelling house; Alterations or additions to an existing building or structure | 26 Apr 2024 | Determined 6 May 2024 |
$35,500 | — |
| 467 Comboyne Road Wingham 2429 MOD2024/0010 |
Demolition; Dwelling house; Erection of a new structure; Residential Accommodation | 24 Apr 2024 | Withdrawn | — | — |
| 9 Karthena Crescent Hawks Nest 2324 DA2024/0018 |
Dwelling house; Alterations or additions to an existing building or structure | 24 Apr 2024 | Determined 16 Dec 2024 |
$74,004 | 1 |
| 40 Scarborough Circuit Red Head 2430 DA2024/0269 |
Dwelling house; Erection of a new structure | 24 Apr 2024 | Determined 20 Jun 2024 |
$431,678 | 1 |
| 60 The Anchorage Hawks Nest 2324 DA2024/0287 |
Dwelling house; Alterations or additions to an existing building or structure | 24 Apr 2024 | Determined 23 May 2024 |
$104,019 | 1 |
| 38 Marra Drive Old Bar 2430 DA2024/0292 |
Dwelling house; Erection of a new structure; Air-conditioning units; Balcony, deck, patio, terrace or verandah; Clothes hoists and clothes lines; Driveways and hard stand spaces; Fences; Garage, carport or carparking space; Hot water systems; Letterboxes; Rainwater tanks | 24 Apr 2024 | Determined 7 May 2024 |
$590,717 | 2 |
| 61 Pretoria Parade Harrington 2427 DA2024/0268 |
Alterations or additions to an existing building or structure; Carport | 23 Apr 2024 | Determined 28 May 2024 |
$10,947 | — |
| 33 Cove Boulevard North Arm Cove 2324 MOD2024/0094 |
Secondary dwelling; Dwelling house; Erection of a new structure | 23 Apr 2024 | Determined 23 May 2024 |
$350,000 | 2 |
Source: NSW Planning Portal Online DA open API. Cost of works is the applicant's own estimate as lodged, not an assessed or final figure.