Development applications — Lake Macquarie City Council
14,203 applications since 2019, proposing 20,329 new dwellings.
Largest by cost of works
| Address | What | Cost of works | Status |
|---|---|---|---|
| 81 Trinity Point Drive Morisset Park 2264 | Residential flat building; Hotel or motel accommodation; Restaurant or cafe; Business premises; Erection of a new structure; Pathways and paving; Car park; Recreation/Tourist Premise; Function centre; Tourist and visitor accommodation; Serviced apartment; Food and drink premise; Swimming pool; Residential Accommodation | $663,947,795 | Determined |
| 81 Trinity Point Drive Morisset Park 2264 | Demolition; Residential flat building; Hotel or motel accommodation; Restaurant or cafe; Subdivision; Outdoor dining - general; Earthworks, retaining walls and structural support; Landscaping structures; Pathways and paving; Function centre; Health services facility; Swimming pool | $463,012,395 | Under Assessment |
| 10 Woodford Street Cameron Park Nsw 2285 | Subdivision | $116,000,000 | Determined |
| 10 Woodford Street Cameron Park 2285 | Subdivision | $116,000,000 | Determined |
| 2a Maude Street Belmont 2280 | Residential flat building; Alterations or additions to an existing building or structure | $75,570,000 | Determined |
All applications, most recently lodged first
| Address | What | Lodged | Status | Cost | Dwellings |
|---|---|---|---|---|---|
| 11//Dp734804 DA/509/2024/B |
Erection of a new structure; Dual occupancy (detached) | 2 Dec 2025 | Determined 3 Feb 2026 |
$392,034 | 2 |
| 7 Southampton Avenue Buttaba 2283 DA/2025/2025 |
Erection of a new structure; Carport; Garage, carport or carparking space | 2 Dec 2025 | Determined 29 Jan 2026 |
$74,760 | — |
| 15 Third Street, Booragul, Nsw 2284 DA/2012/2025 |
Dwelling house; Alterations or additions to an existing building or structure; Change of use of land or a building or the classification of a building under the Building Code of Australia | 2 Dec 2025 | Determined 19 Jan 2026 |
$200,000 | 1 |
| 28 Jabbarup Road Wyee 2259 DA/2017/2025 |
Demolition; Erection of a new structure; Centre-based child care | 1 Dec 2025 | Additional Information Requested | $1,655,714 | — |
| 7 Willandra Way Edgeworth 2285 DA/2004/2025 |
Dual occupancy; Medium Density Housing; Erection of a new structure; Dual occupancy (attached); Residential Accommodation | 1 Dec 2025 | Determined 19 Jun 2026 |
$720,000 | 2 |
| 2 Royal Street Warners Bay 2282 DA/1999/2025 |
Alterations or additions to an existing building or structure; Residential Accommodation | 1 Dec 2025 | Determined 6 May 2026 |
$50,000 | — |
| 35 Lake Road Balcolyn 2264 DA/1243/2023/B |
Secondary dwelling; Erection of a new structure | 1 Dec 2025 | Determined 27 Jan 2026 |
$125,500 | 1 |
| 8 Elimatta Road Yarrawonga Park 2264 DA/1981/2025 |
Erection of a new structure; Residential Accommodation | 1 Dec 2025 | Withdrawn | $121,000 | — |
| 35 Fitzwilliam Circuit Macquarie Hills 2285 DA/2014/2025 |
Shed; Erection of a new structure | 1 Dec 2025 | Determined 9 Jan 2026 |
$47,347 | — |
| 3 Reynolds Street Blackalls Park 2283 DA/878/2025/A |
Subdivision; Erection of a new structure; Dual occupancy (detached) | 30 Nov 2025 | Open 17 Dec 2025 |
$528,000 | 1 |
| 495 Martinsville Road Martinsville 2265 DA/1996/2025 |
Dwelling house; Alterations or additions to an existing building or structure; Change of use of land or a building or the classification of a building under the Building Code of Australia; Recreation/Tourist Premise; Function centre; Tourist and visitor accommodation | 28 Nov 2025 | Additional Information Requested | $1,077,505 | 1 |
| 78 Seena Drive Edgeworth 2285 DA/2003/2025 |
Dual occupancy; Medium Density Housing; Erection of a new structure; Dual occupancy (attached); Residential Accommodation | 28 Nov 2025 | Determined 1 Jul 2026 |
$607,200 | 2 |
| 76 Seena Drive Edgeworth 2285 DA/2002/2025 |
Dual occupancy; Medium Density Housing; Erection of a new structure; Dual occupancy (attached); Residential Accommodation | 28 Nov 2025 | Determined 10 Jun 2026 |
$720,000 | 2 |
| 104 Surfside Drive Catherine Hill Bay 2281 DA/2015/2025 |
Alterations or additions to an existing building or structure; Minor building alterations (external) | 28 Nov 2025 | Determined 17 Mar 2026 |
$55,000 | — |
| 57 Elizabeth Street Floraville 2280 DA/1991/2025 |
Dwelling house; Alterations or additions to an existing building or structure | 28 Nov 2025 | Determined 12 Feb 2026 |
$99,990 | 1 |
| 75 Kingsway Avenue Rankin Park 2287 DA/2007/2025 |
Alterations or additions to an existing building or structure; Balcony, deck, patio, terrace or verandah (screened enclosures) | 28 Nov 2025 | Determined 11 Feb 2026 |
$18,150 | — |
| 1 Anouska Street Catherine Hill Bay 2281 DA/1923/2022/A |
Dwelling house; Erection of a new structure; Air-conditioning units; Balcony, deck, patio, terrace or verandah; Barbecues and other outdoor cooking structures; Clothes hoists and clothes lines; Driveways and hard stand spaces; Fences; Garage, carport or carparking space; Hot water systems; Pathways and paving; Skylights, roof windows and ventilators | 28 Nov 2025 | Determined 21 Jan 2026 |
$821,501 | 1 |
| 15 Highfields Parade Highfields 2289 DA/1075/2023/A |
Residential flat building; Alterations or additions to an existing building or structure | 28 Nov 2025 | Determined 14 Jan 2026 |
$290,045 | 1 |
| 73 Yorston Street Warners Bay 2282 DA/2013/2025 |
Alterations or additions to an existing building or structure; Carport | 28 Nov 2025 | Determined 7 Jan 2026 |
$9,200 | — |
| 70 Burwood Road Whitebridge 2290 DA/1200/2024/B |
Alterations or additions to an existing building or structure; Community facility | 28 Nov 2025 | Determined 10 Dec 2025 |
$897,534 | — |
| 73 Hamilton Street Kahibah 2290 DA/151/2023/A |
Dwelling house; Erection of a new structure | 27 Nov 2025 | Determined 1 May 2026 |
$707,993 | 1 |
| 41 Quinlan Circuit Cooranbong 2265 DA/2008/2025 |
Dwelling house; Erection of a new structure | 27 Nov 2025 | Determined 26 Feb 2026 |
$539,866 | 1 |
| 65 Camberwarra Drive Belmont North 2280 DA/2009/2025 |
Dwelling house; Erection of a new structure | 27 Nov 2025 | Determined 22 Dec 2025 |
$631,510 | 1 |
| 140 Ross Street Belmont 2280 DA/1978/2025 |
Erection of a new structure; Water recreation structure | 26 Nov 2025 | Determined 21 Apr 2026 |
$33,000 | — |
| 17a Valentine Crescent Valentine 2280 DA/1935/2025 |
Erection of a new structure; Awnings, blinds and canopies | 26 Nov 2025 | Additional Information Requested | $30,000 | — |
| 52 Park Avenue Caves Beach 2281 DA/2859/2022/A |
Alterations or additions to an existing building or structure; Landscaping structures | 26 Nov 2025 | Determined 17 Feb 2026 |
$3,500 | — |
| 52 Fig Crescent Edgeworth 2285 DA/1993/2025 |
Erection of a new structure; Earthworks, retaining walls and structural support | 26 Nov 2025 | Determined 6 Feb 2026 |
$45,000 | — |
| 8 Dalmeny Drive Macquarie Hills 2285 DA/2043/2025 |
Dwelling house; Alterations or additions to an existing building or structure | 26 Nov 2025 | Determined 5 Feb 2026 |
$317,500 | — |
| 6 Brooks Parade Belmont 2280 DA/1997/2025 |
Dwelling house; Alterations or additions to an existing building or structure | 26 Nov 2025 | Determined 4 Feb 2026 |
$17,505 | — |
| 110 Wyndham Way Eleebana 2282 DA/1551/2023/A |
Dwelling house; Subdivision; Erection of a new structure; Dual occupancy (attached); Dual occupancy (detached) | 26 Nov 2025 | Withdrawn 4 Jun 2024 |
$2,501,733 | 5 |
| 10 Swansea Street Swansea 2281 DA/2006/2025 |
Shed; Erection of a new structure | 26 Nov 2025 | Determined 22 Jan 2026 |
$73,944 | — |
| 19 Puntee Street Kilaben Bay 2283 DA/1994/2025 |
Erection of a new structure; Awnings, blinds and canopies | 26 Nov 2025 | Determined 6 Jan 2026 |
$34,980 | — |
| 41 Wallace Street West Wallsend 2286 DA/1990/2025 |
Erection of a new structure; Swimming pool | 26 Nov 2025 | Determined 15 Dec 2025 |
$7,999 | — |
| 9 Amos Street Bonnells Bay 2264 DA/1902/2022/C |
Dual occupancy; Dwelling house; Erection of a new structure; Dual occupancy (detached); Residential Accommodation | 25 Nov 2025 | Determined 23 Jun 2026 |
$905,600 | 2 |
| 113 Avondale Road Cooranbong 2265 DA/1970/2025 |
Demolition; Subdivision | 25 Nov 2025 | Determined 15 Jun 2026 |
$1,678,540 | — |
| 59 Bay Street Balcolyn 2264 DA/2024/2025 |
Dwelling house; Erection of a new structure; Residential Accommodation | 25 Nov 2025 | Determined 6 May 2026 |
$25,000 | — |
| 35 Bright Circuit Dora Creek 2264 DA/1952/2025 |
Subdivision | 25 Nov 2025 | Determined 1 Apr 2026 |
$860,000 | — |
| 15 Bright Circuit Dora Creek 2264 DA/1955/2025 |
Subdivision | 25 Nov 2025 | Determined 4 Mar 2026 |
$860,000 | — |
| 16 Quarry Road Speers Point 2284 DA/1874/2023/A |
Subdivision; Erection of a new structure; Dual occupancy (attached) | 25 Nov 2025 | Determined 27 Nov 2025 |
$954,000 | 2 |
| 21 Bright Circuit Dora Creek 2264 DA/1953/2025 |
Subdivision | 25 Nov 2025 | Determined 29 Jan 2026 |
$865,000 | — |
Source: NSW Planning Portal Online DA open API. Cost of works is the applicant's own estimate as lodged, not an assessed or final figure.